1200 MW Matarbari Ultra Super Critical Coal-Fired Power Project

1200 MW Matarbari Ultra Super Critical Coal-Fired Power Project — image 1
1200 MW Matarbari Ultra Super Critical Coal-Fired Power Project — image 2
1200 MW Matarbari Ultra Super Critical Coal-Fired Power Project — image 3
1200 MW Matarbari Ultra Super Critical Coal-Fired Power Project — image 4
1200 MW Matarbari Ultra Super Critical Coal-Fired Power Project — image 5
1200 MW Matarbari Ultra Super Critical Coal-Fired Power Project — image 6
1200 MW Matarbari Ultra Super Critical Coal-Fired Power Project — image 7
1200 MW Matarbari Ultra Super Critical Coal-Fired Power Project — image 8
1200 MW Matarbari Ultra Super Critical Coal-Fired Power Project — image 9
1 / 9
Geotechnical

1200 MW Matarbari Ultra Super Critical Coal-Fired Power Project

GnS Scope of Work

2B+G+10=13 storied building with two basement is a heavy loaded structure. Length and size of piles has been reduced by considering soil-structure interaction

Safety-focused, code-compliant design
Experienced specialist engineers
Delivered on schedule & on budget
Full quality control & supervision

At a Glance

  • Category
    Geotechnical

Planning a similar project?

Let our specialist engineers design it for you — safely, economically and on time.